Brechfa Forest West Wind Farm is a wind farm in Brechfa Forest in Carmarthenshire in south west Wales. Construction of the wind farm began in November 2016 and power generation commenced in January 2018.[1]

Planning

Innogy Renewables UK Ltd. proposed that the wind farm would be built in Strategic Search Area G, created as part of the Welsh Government's TAN 8[2] policy, published in 2005. Brechfa Forest West Wind Farm, had a proposed capacity of greater than 50 MW; thus the application was submitted to the Infrastructure Planning Commission.

The Brechfa Forest West development, located near the Afon Pib valley, consists of 28 turbines with a maximum tip height of 145 metres. The turbines have a generating capacity of around 57.4 MW. The plans were opposed by local activists.[3]

As the Infrastructure Planning Commission ceased to exist in April 2012, the Brechfa Forest West application fell to the National Infrastructure Planning section of the Planning Inspectorate to produce a recommendation for the Secretary of State at DECC. They recommended approval, and DECC confirmed that development consent for Brechfa Forest West was granted on 12 March 2013.[4]

Carmarthenshire County Council Planning Committee approved the planning application for Brechfa Forest East at their 17 December 2013 meeting.[5]

Construction

Construction on the Brechfa Forest West wind farm started in November 2016, and all turbines were operational in June 2018.[6]

See also

  • flagWales portal
  • iconWeather portal
  • iconRenewable energy portal
  • Infrastructure Planning Commission
  • Planning Inspectorate

References

  1. ^ Lewis, Ian (19 January 2018). "The first electricity from new West Wales wind farm has started being produced". walesonline. Retrieved 31 August 2018.
  2. ^ "Building and planning". Welsh Government. Archived from the original on 5 August 2019.
  3. ^ "Stop the Brechfa Forest wind turbines". Turbineaction.co.uk. 13 January 2011.
  4. ^ "NIPS website". Archived from the original on 23 September 2013. Retrieved 21 September 2013.
  5. ^ "'Tall' Brechfa Forest wind turbine plans are approved". BBC News. 17 December 2013.
  6. ^ Innogy Renewables UK. "Brechfa Forest West Onshore Wind Farm". iam.innogy.com. Retrieved 31 August 2018.

External links

  • RWE in Wales
  • v
  • t
  • e
Companies
Onshore wind farms
Active
Proposed
Offshore wind farms
Active
Proposed
Cancelled
Installation vessels
  • MPI Adventure
  • MPI Resolution
  • MPI Discovery
Other
  • icon Wind power portal
  • Category
  • Commons
  • v
  • t
  • e
Distribution network operators
Power stations
Coal-fired
Closed
Gas-fired
Active
Future
  • Abernedd
Closed
Hydroelectric
Active
Nuclear
Closed
Oil-fired
Closed
Wind farms
Active
Cancelled
Tidal
Other
  • Category
  • icon Energy
  • flag Wales
Stub icon

This article about a Welsh building or structure is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e
Stub icon

This article about a wind farm is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e

This article about a British power station is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e